ARRCAfrican Rescue & Recovery CorpsFrançais

Search · Rescue · Reconstruction

From the first hour to the last wall rebuilt

An African corps that deploys to disasters across Sub-Saharan Africa to find and free the people trapped there, and stays to restore the access, water and power a community needs to recover — under the authority of the country we serve.

Why a continental corps

The gap between the first day and the next decade

When the Al Haouz earthquake struck Morocco in September 2023, more than 2,900 people died. Two days later, Storm Daniel broke two dams above Derna in Libya and swept away entire districts of the city. Both disasters needed specialist rescue within hours and reconstruction for years.

Africa has some highly capable national rescue teams — Morocco, Algeria and South Africa hold United Nations INSARAG classification — but they are few for a continent of fifty-four countries, and international teams often arrive from much further away. Reconstruction, meanwhile, is usually left to a different set of organisations, after the rescuers have gone home.

ARRC exists to close that gap: one corps, responsible for both the rescue and the recovery, and accountable for both.

Two arms, one corps

Rescue and recovery, planned together

01

Search and rescue

Urban search and rescue teams trained to locate, reach and extract people trapped in collapsed buildings, with the medical, structural engineering and logistics support to work self-sufficiently from the moment they land.

02

Recovery and reconstruction

Engineering teams that assess damaged buildings, restore emergency water, power and access, and then rebuild permanent infrastructure designed to withstand the next event rather than repeat the last one.

Capabilities

Three operational, one being built

Search and rescue, flood rescue and emergency infrastructure are operational in Sub-Saharan Africa. Permanent reconstruction is the next capability the Corps is building, and will be marked operational only once it can be delivered.

  • Operational

    Urban search and rescue

    Search, rescue, medical and structural specialists organised to the INSARAG Guidelines — the United Nations methodology every international rescue team works to.

  • Operational

    Flood and water rescue

    Swift-water and flood rescue for the river, flash and coastal flooding that recurs across much of the continent, often after the failure of a dam or embankment.

  • Operational

    Emergency infrastructure

    Rapid damage assessment, temporary bridging, debris clearance, and emergency water and power — the work that lets relief reach a community at all.

  • In development

    Reconstruction

    Permanent rebuilding of public infrastructure and safer housing, designed and supervised with local engineers and built to hazard-resistant standards.

How a response runs

Rescue is the first week. Recovery is the next ten years.

  1. 01

    Mobilise

    Teams move only at the request of the affected government, and are designed to be ready at their point of departure within hours of that request.

  2. 02

    Rescue

    Search and rescue under the coordination of national authorities and the UN on-site coordination structure, sharing information with every other team on the ground.

  3. 03

    Stabilise

    Building assessments, emergency repairs and restored services, so that people can return to safe homes and aid can move.

  4. 04

    Rebuild

    Permanent reconstruction, owned by local institutions and built back better — the principle of the Sendai Framework that Africa has adopted for disaster recovery.

What we commit to

The standard we hold ourselves to

ARRC is young and its record is short. What it can be held to, on every deployment, is how it works.

  1. Only when asked

    The Corps deploys at the request of the affected country and works under the authority of its national emergency management, never around it.

  2. International standards, earned not claimed

    Teams train to the INSARAG Guidelines, and the Corps is working towards national accreditation and UN classification. Until a classification is earned, the Corps will not describe itself as holding one.

  3. Build back better

    Reconstruction is designed so the next earthquake, flood or storm does less damage — not so the old weaknesses are rebuilt faster.

  4. A public record

    Every deployment will be reported in public: what was asked, what was done, what it cost, and what went wrong.

News

Latest

All news

Announcements will be published here.

Help build the Corps

We want to hear from rescuers, engineers, medics, governments and institutions who want to see this capability exist in Africa.

Ways to get involved